东京一本一道一二三区-动漫av网站免费观看-动漫av在线播放-动漫精品成人免费网站-激情影院费观看-激情影院免费

CNG Pressure Regulating Station

Classification: CNG Pressure Reduction Skid

Release time: 03-30-2024

Number of views: 75

Product Summary: As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of n...
86-0515-83664888

Product details

As China’s energy structure evolves and environmental protection efforts intensify, the development and utilization of natural gas have rapidly advanced. Compressed natural gas (CNG) involves purifying and compressing wellhead or pipeline natural gas for high-pressure storage and transportation, delivered to usage sites where it is depressurized through multi-stage heat exchange before being directly input into the supply network for various users.

Economic Scope and Supply Capacity:

The CNG pressure reduction station is economically viable within 300 kilometers, generally not exceeding 500 kilometers, suitable for supplying 2000-4000 households with a gas supply volume of 200-5000 Nm3/h. Too large or too small a volume increases the unit cost of gas consumption.

This system involves smaller investment scales and shorter construction periods compared to long transmission pipelines, providing quick capital recovery. It can also serve as a peaking and backup gas source for long transmission pipelines in the future.

Process Overview:

The working principle of a compressed natural gas pressure reduction station involves high-pressure natural gas from skid-mounted tanks being preheated, progressively depressurized, and undergoing safety control, metering, odorization, and other processes to achieve pressure levels that meet regulatory standards for pipeline transmission. Pressure adjustment can be implemented as two-stage or three-stage regulation.

Structural Overview:

The compressed natural gas pressure reduction station is divided into the following functional sections based on the layout and functions of the equipment:

Unloading System: 

High-pressure hoses, quick-connect couplings, high-pressure valves.

Pressure Regulation and Heat Exchange System: High-pressure emergency cutoff valves, heat exchangers, regulators, vent valves.

Flow Metering System: Flow meters.

Control System: Central control console.

Heating System: Gas boilers, hot water pumps, etc.

The high-pressure natural gas from the skid-mounted tanks first enters the pressure regulation and heat exchange system through the unloading system. Inside, it undergoes two heat exchanges and two or three pressure reductions before entering the flow metering and odorization system, and finally into the distribution network. The heating system provides the necessary heat for the gas pressure reduction process, while the control system monitors the entire system.

Pressure Regulation Process:

Two-stage Regulation Process: Initially, high-pressure hoses and quick-connect couplings connect to the skid-mounted tankers. Compressed natural gas passes through ball valves and high-pressure cutoff valves into a primary heat exchanger where the gas is heated, then through a primary regulator to reduce pressure to 1.0-4.0 MPa, followed by secondary heat exchange and regulation down to 0.1-0.4 MPa, metered for flow, and finally odorized before entering the medium-pressure network. All stages of gas pressure, temperature, flow, water temperature, critical valve controls, and switching between paths are interlock controlled by the central console.

Three-stage Regulation Process: Similar to the two-stage process, with an additional third stage of pressure reduction to further fine-tune the outlet pressure suitable for the medium-pressure network.

This comprehensive setup ensures efficient, safe, and environmentally friendly distribution of natural gas to various consumers.

Product
Gas Pressure Regulator
Gas Pressure Regulating Box
Gas Pressure Regulating Station (Skid)
CNG Pressure Reduction Skid
LNG Vaporization Station (Skid)
LNG Refueling Station
CNG Filling Station
PLC Control System
About us
Company introduction
Production workshop
Corporate Culture
Case show
Customer Cases
Installation Site
Contact us

Jiangsu Dachang Gas Equipment Co., Ltd.

Phone: 86-0515-83664888

Fax: 86-0515-83664666

Email: dcgas@cndcgas.com

Address: Liuzhuang Industrial Park, Dafeng District, Yancheng City, Jiangsu Province

Copyright:Jiangsu Dachang Gas Equipment Co., Ltd. Filing number:Su ICP Bei 17011481
主站蜘蛛池模板: 九九视频免费观看| 久久亚洲网站| 波多野结衣dvd在线播放| 亚洲国产成人久久综合一区| 欧美97欧美综合色伦图| 国产乱码精品一区二区三上| 182tv在线看| 五月婷婷激情| 日本tv欧美tv天堂| 久久精品亚洲日本波多野结衣| 大黄免费网站| 中文字幕在线视频播放| 四虎欧美| 欧美性video老少配| 精品欧美亚洲韩国日本久久| 草草免费观看视频在线| 在线观看免费网址大全| 深夜福利日韩| 欧欧美18videosex性哦欧美美| 久久99国产精品成人| 国产成人亚洲欧美激情| 91制片厂制作果冻传媒所有| 亚洲精品蜜桃久久久久久| 日韩经典中文字幕| 男人午夜免费视频| 激情综合网五月婷婷| 国产成人精品午夜| 99热在线精品观看| 曰b免费视频| 网站在线观看你懂的| 日本免费人成黄页网观看视频| 玖玖精品视频| 黄网在线| 国产精品最新资源网| xxxww中国| 88av在线视频| 亚洲一区二区三区在线播放| 天美传媒影视app最新版下载| 日本a∨在线| 欧美激情精品久久久久久久| 久久99精品久久久久久秒播放器|